Charging a Vmoto is simple: plug in overnight or at work with the standard charger, or use a fast or super-fast charger on compatible models. Here’s how long each model takes and how to look after your battery.
Supplied with your bike. Charge overnight at home or during the working day – most models take 3.5 to 7 hours.
Available for selected models such as the CPx, CPx Explorer and VS2 CITI – roughly halves the charging time.
On compatible models, 0% to 80% in about 30 minutes – ideal for busy days and fleets.
Exchangeable batteries and swapping cabinets let delivery riders swap a flat battery for a charged one. More below.
Manufacturer figures. Times are from flat to full unless stated; real-world times vary with temperature and battery condition.
| Model | Battery | Standard charge | Faster options |
|---|---|---|---|
| Stash | 74V 97Ah | 5–6 h (1.5 kW) | 2.5 h with optional charger |
| TC Max | 72V 45Ah | 4.5 h (0.75 kW) | – |
| TS Street Hunter PRO | 2 × 60V 32Ah | 3.5 h per battery | – |
| TC Wanderer PRO | 2 × 60V 32Ah | 3.5 h per battery | – |
| TC | 60V 30Ah | 3–4 h | – |
| TSx | Ask us | Ask us | – |
| CUx Pro | 60V 43Ah | 4–5 h (600 W) | – |
| CPx | 2 × 74V 30Ah | 5 h | Optional fast charger (1.44 kW); super-fast 0–80% in ~30 min (6.6 kW) |
| CPx Pro | 2 × 60V 45Ah | 7 h for both batteries (1 kW) | – |
| CPx Explorer | 2 × 74V 45Ah | 5 h per battery (720 W) | 3 h per battery (1.44 kW); super-fast 0–80% in ~30 min (6.6 kW) |
| VS1 | 60V 45Ah per battery | 3.5 h (fast charger, 0.9 kW) | – |
| VS2 CITI | 1 or 2 × 74V 30Ah | 3.5 h per battery | 1.5 h per battery (optional); super-fast 0–80% in ~30 min (6.6 kW) |
| VS3 | 60V 90Ah | 7 h for both batteries (0.9 kW) | – |
| CPX Fleet | 60V 45Ah (optional second battery) | 3.5 h per battery (0.9 kW) | – |
For delivery fleets and high-mileage riders, Vmoto offers a complete energy system – batteries, swapping cabinets, fast chargers and fleet systems designed to work together with its vehicles.

Every Vmoto runs on a lithium battery pack, and many models can carry one or two packs. Exchangeable batteries can be swapped for a charged pack instead of waiting for the bike to charge.

Riders take out a flat battery and pick up a fully charged one on the spot – no going back to base to recharge.

When there’s no time for an overnight charge, fast charging gets riders back out quickly.

Ties vehicles, batteries, cabinets and chargers together so an operator can run a fleet efficiently. Vmoto supplies its swap-and-charge systems to selected business partners.
Not sure which charger you need, or want a fast charger fitted for your business? Our team in Oxford and Bicester can advise and supply the right setup.
Charging information is summarised from Vmoto UK’s published specifications (vmoto.co.uk), checked 14 October 2026. Battery and charger options vary by model and market – please confirm with us before buying. Swap & Charge details from Vmoto UK (product images © Vmoto UK, used with permission), including its article on battery swapping stations with Zenion. Cost example is illustrative only. Vmoto is a trademark of its owner.